joe cunha

Asbury Park

City engineer leaves post

Cunha criticizes unnamed 'select few wielding immense power'

By Dan Jacobson
Tweet



City Engineer Joseph Cunha’s last day on the job was Friday and his departure appears not to be a happy one, according to an email he sent to city hall coworkers and community leaders. “It has always been my firm belief that the greater good shall ultimately prevail in times of woe as evidenced by […]

Read more →


May 18, 2015
Asbury Park

Sunset Avenue footbridge rebuild on the horizon

City engineer anticipates project will be ready for bid in early 2015

By Jill Bartlett
Tweet



A historic pedestrian bridge damaged during Hurricane Sandy may finally be fully rebuilt soon. The bridge, which connects Emory Street between Sunset and Fifth avenues, has remained barricaded since days after the Oct. 29, 2012 storm after it suffered structural damage and was deemed unsafe. Project specifications for a full replacement bridge are currently being […]

Read more →


Dec 30, 2014
Asbury Park

Wesley Lake faces drainage issues

Outflow pipe stopped up with sand, pond weed leaves trash trapped

By Jill Bartlett
Tweet



An outflow pipe that allows water to exchange between Wesley Lake and the ocean is clogged with sand, and a pond weed is further trapping debris and garbage in the coastal lake. City public works employees identified the problem with the pipe Wednesday, according to City Engineer Joe Cunha, who heads up the department. Workers […]

Read more →


Sep 18, 2014
Asbury Park

Phase two boardwalk repairs move along as planned

Replacement decking now being installed

By Jill Bartlett
Tweet



Reconstruction of a southern portion of the Asbury Park boardwalk is coming along right on schedule, according to City Engineer Joe Cunha. Workers started to install decking on the southernmost section where pilings have already been placed [shown above] and will continue over the newly placed pilings in the days ahead, he said. Staten Island-based […]

Read more →


Mar 24, 2014
Asbury Park

$400,000 sewer connection fee ‘never was accurate’

City, beer garden owners still unsure whether fee applies

By Jill Bartlett
Tweet



A city official has commented on a social media site that the $400,000 sewer connection fee calculated for the Asbury Park Festhalle and Biergarden is inaccurate. “The $400,000 potential fee for the Beer Garden is not currently and never was accurate [too high],” said City Engineer Joe Cunha on a Asbury Park Nextdoor.com post about […]

Read more →


Jan 17, 2014
Asbury Park

Solid sub-boardwalk repair technique scrapped

FEMA says it is too late to change plans for already approved design

By Jill Bartlett
Tweet



The Asbury Park City Council voted Wednesday to move forward with original plan to perform second phase boardwalk reconstruction with traditional methods instead of a new, never-before-used method. After City Manager Terence Reidy reviewed the plan with the city’s FEMA liaison it was determined a new method would not to be feasible since plans to […]

Read more →


Oct 17, 2013
Asbury Park

Phase two boardwalk repairs under review

City considers new, never-before-used method for substructure restoration

By Jill Bartlett
Tweet



In light of the recent boardwalk fire in Seaside Park, representatives from the Federal Emergency Management Agency along with City Engineer Joe Cunha presented a new method for the city council to consider for the second phase of boardwalk reconstruction. It would be the first boardwalk nationwide to reconstruct with the new technique, according to […]

Read more →


Oct 03, 2013
Asbury Park

Bridge repairs will commence fall of 2014

City, county in talks as to where motorists will be diverted

By Jill Bartlett
Tweet



Motorists will experience at least a two-year detour when construction on the Sunset Avenue bridge replacement project begins, but where the diversion will take place is still not finalized. The project has been a topic of conversation between Monmouth County officials and the city for over a year. The bridge [shown above], which links Asbury […]

Read more →


Sep 25, 2013
Asbury Park

Special meeting date set for Main St. redesign discussion

Will take place Sept. 25 at 6 p.m. in council chambers

By Jill Bartlett
Tweet



The Asbury Park City Council will hold a special meeting in September with representatives of the New Jersey Department of Transportation [NJDOT] to discuss the state’s proposed redesign of Main Street, and local business owners and residents are invited to weigh in. Commonly referred to as the “road diet,” the plan would reconfigure Rt. 71, […]

Read more →


Aug 22, 2013
Asbury Park

The Sun’s City Council preview — Aug. 21, 2013

Public hearing on budget amendment, discussion to create several committees on agenda

By Jill Bartlett
Tweet



The city council is scheduled to meet tonight in council chambers at City Hall. A closed executive session will start at 5 p.m., followed by a workshop session at 6 p.m. and a regular council meeting at 7 p.m. Several special applications for liquor licenses are on the agenda. They include an application to extend […]

Read more →


Aug 21, 2013
123

0

subscribers

0

followers




© 2012-2017 Limited Risk, Inc.